Featured Project

Māori Television Car Park Redevelopment
Auckland
Bromley Group completed civil works as part of a car park redevelopment for the Māori Television studios. The works included pavement preparation, kerb and channel, concrete flatwork, rain garden elements, drainage coordination and asphalt surfacing.
Scope of Works
- Site preparation and pavement formation
- Kerb and channel installation
- Concrete footpaths and flatwork
- Drainage coordination and rain garden works
- Asphalt surfacing and final reinstatement
Site Considerations
The works required careful sequencing around an active site environment, with attention to access, safety, levels, drainage falls and finished surface quality.
Outcome
The completed works provided a cleaner, more functional car park environment with improved pavement structure, drainage performance and long-term usability.

Commercial Asphalt Repair
Auckland
Saw-cut, remove and replace asphalt repair works for a commercial site, including localised excavation, base preparation and hotmix reinstatement.

Timber Retaining Wall Installation
Auckland
Treated timber retaining wall construction including excavation, post installation, drainage, backfill and reinstatement.

Stormwater Drainage Installation
Auckland
Stormwater drainage installation including trench excavation, pipe laying, bedding, backfill and surface reinstatement.

Concrete Paths and Flatwork
Auckland
Concrete paths and flatwork delivered with base preparation, formwork, placing, finishing and saw-cut control joints.

Kerb and Channel Works
Auckland
Kerb and channel construction completed as part of civil site works, including preparation, concrete placement and reinstatement.

Subdivision Civil Works
Auckland
Civil works for subdivision projects including earthworks, drainage, access preparation, concrete works and final reinstatement.