Multi-Lot Residential Subdivision: Auckland's Northwest
Auckland, New Zealand
Bromley Group was engaged to deliver the principal civil construction works for a multi-lot residential subdivision in Auckland's northwest. The project involved coordinated delivery across earthworks, stormwater infrastructure, retaining walls, culvert construction and pavement formation. The works were undertaken within a rural site containing an existing stream environment, requiring sequencing, erosion and sediment controls, environmental management, inspections and coordination with the wider project team.

Māori Television Car Park Redevelopment
Auckland
Civil works for a car park redevelopment at the Māori Television studios, including pavement preparation, kerb and channel, concrete flatwork, rain garden elements and asphalt surfacing.

Commercial Asphalt Repair
Auckland
Saw-cut, remove and replace asphalt repair works for a commercial site, including localised excavation, base preparation and hotmix reinstatement.

Timber Retaining Wall Installation
Auckland
Treated timber retaining wall construction including excavation, post installation, drainage, backfill and reinstatement.

Stormwater Drainage Installation
Auckland
Stormwater drainage installation including trench excavation, pipe laying, bedding, backfill and surface reinstatement.

Concrete Paths and Flatwork
Auckland
Concrete paths and flatwork delivered with base preparation, formwork, placing, finishing and saw-cut control joints.

Subdivision Civil Works
Auckland
Civil works for subdivision projects including earthworks, drainage, access preparation, concrete works and final reinstatement.
Mt Eden Stormwater Remediation: Commercial Car Park
Auckland Central
Stormwater remediation for a commercial car park in Mt Eden, including channel drain installation, a new concrete cesspit and full asphalt reinstatement.
Mission Bay Residential Driveway Reinstatement
Mission Bay, Auckland
Full driveway reinstatement across two adjoining residential properties in Mission Bay, including demolition, a new exposed aggregate concrete slab and a new channel drain at the gate line.